Obtaining and submitting a building permit for NEW CONSTRUCTION:

  • Obtain and complete a building permit application.  Click HERE to obtain a (pdf) copy of the application.

  • Submit with the completed application, three (3) complete sets of building plans, each of which must  include:

    • Floor plans of the proposed construction including construction details.

    • Foundation plans, including all details.

    • Elevations of the proposed building for all four views.

  • Submit with the completed application and three 3) sets of building plans a site plan as detailed here:

    • The location of the proposed construction on the property.

    • The location and construction of any proposed delivery(s)..

    • The location of all easements or a note on the plan that none exists.

    • The surface water drainage for the property.

    • The location of individual trees or groups of trees with a callipered diameter of four inches or more when measured 48 inches from the ground.

  • A finished floor elevation survey is required for all new structures prior to foundation approval.

Required Inspections:

  • Installation of a temporary pole.

  • Pier inspections – if not engineer designed.

  • Foundation – A finished floor elevation survey reflecting floor elevations and setbacks from property lines must be submitted prior to calling for this inspection.  If foundation is engineered, City must have a letter, signed and stamped with a seal from the engineer prior to pouring that states that the engineer has inspected the project and that it passes according to design.

  • Electrical rough, Framing rough, HVAC rough, Plumbing top out should be called in together.

  • Electrical final, Framing final, HVAC final, Plumbing final, certificate of occupancy should be called in together.

Electrical Inspection fee - $58.50ea.  Other Inspection fee - $37.50 ea.

·        

 
 


 
  MERIDIAN
 INFORMATION

 Emergency
   Notification
      System

 Meridian Chamber
     of Commerce

 Community Profile

 Meridian History

 Senior Citizens

 Area Demographics

 Meridian in Pictures

 Area Interests

 Tourism

 Community
     Calendar

 Drivers License

 Taxes

 Solid Waste
   Disposal Project

 Community Links

 Back to Home Page

 

 


CITY of MERIDIAN TEXAS
111 N. Main Street
P.O. BOX 306
MERIDIAN, TEXAS  76665
254-435-2381
E-Mail Us At: 
info@meridiantexas.us

©Copyright 2009
City of Meridian Texas
All Rights Reserved

V1.0.0

This Page Last Updated
Saturday, June 05, 2010